Syllabus
Registration via LPIS
Day | Date | Time | Room |
---|---|---|---|
Saturday | 11/16/24 | 09:00 AM - 05:00 PM | LC.2.064 PC Raum |
Friday | 11/22/24 | 09:00 AM - 05:00 PM | LC.2.064 PC Raum |
Saturday | 11/23/24 | 09:00 AM - 05:00 PM | LC.2.064 PC Raum |
- Master data for the MRP process: Implementation of the organizational structure, materials master and material planning, product structure, cost centre planning and work centres, linkage between cost accounting and production/logistics, work centres and their capacity, routings.
- MRP and accounting: Deriving sales projections and primary requirements, MRP, planned production orders and purchase requisitions, customizing the MRP process, linking MRP to accounting.
- Procurement logistics and accounting: Master data in procurement, information records, processing the purchase requisitions produced by the MRP run and deriving purchase orders; delivery and billing of the items ordered.
- Production planning and control: Entering and checking production orders, lot splitting/summarizing, capacity planning and smoothing; process-oriented customizing with respect to scheduling, availavility check, calculation schemes, and order execution/confirmation.
- Sales logistics and revenue accounting: Selling items, price determination, accounting, inventory management, customer management (credit limit, customer-specific discounts, etc.).
- Specific Teaching Strategies: Interactive, problem-based lectures and seminars will demonstrate the linkages between concept and practise for the above-mentioned processes through illustrating in real-time how these matters can be implemented in SAP ECC.
- Entity Relationship Models for master data entry and Event-driven Process Chains (EPCs) for operational processes will help students to navigate through the ECC system and to see the link between the concept to be implemented and the actual information system. The students will prepare a case study which combines the production, logistics, and the project-oriented processes of an industrial company.
Maximum absence time allowed in class: 2 hours. The lecturer has to be informed in advance. Students are obliged to perform the steps in the case study implementation they missed independently.
- Cost accounting 20%
- MRP master data 20%
- MM/PP customizing 20%
- SOP and MRP 20%
- Operational MM/PP processes 20%
(1) Excellent: 90% - 100%
(2) Good: 80% - <90%
(3) Satisfactory: 70% - <80%
(4) Sufficient: 60% - <70%
(5) Fail: <60%
As soon as a partial performance has been handed in, there is always a grade at the end of the course - even if the student leaves the course at a later date.
If you want to attend this course, you have to enroll and attend Course IV Integration Management with SAP ECC: An Introduction to Controlling and Logistics in the same semester!
Kurs IV Integration Management with SAP ECC: An Introduction to Controlling and Logistics
is the basis for the following two courses (Kurs V)
- 0755- Integration Management wth SAP ECC: Implementation Project or
- 0773- Project Management with SAP
SAP based courses must be done together in the same semester!
Registration for this course is not done via LPIS but in the following way:
After registration for course IV (via LPIS) you will receive an email with a doodle link. There you "register" for either "0755 - Implementation Project" (16 places available) or "0773 - Project Management with SAP" (14 places available). This registration is COMPULSORY! The first-come-first-serve principle is applied. The final registration is done by the Institute for Production Management.
It is not possible to only register for Kurs IV without attending an appropriate Kurs V. If this happens, the student is unsubscribed from Kurs IV and Kurs V.
In each course there must be at least 10 students, otherwise the course must be cancelled.
If you recognized this course from an exchange Semester, you cannot attend either of the two aforementioned courses V.
Please log in with your WU account to use all functionalities of read!t. For off-campus access to our licensed electronic resources, remember to activate your VPN connection connection. In case you encounter any technical problems or have questions regarding read!t, please feel free to contact the library at readinglists@wu.ac.at.
Back